Portes ouvertes Ontario

Rob and Cheryl McEwen Graduate Study & Research Building Portes ouvertes Toronto

Nouveau

Rob and Cheryl McEwen Graduate Study & Research Building

Standing near the main entrance of York’s Keele campus, the new building features a 27-metre-high solar chimney to maximize natural ventilation and use of renewable energy; green roofs featuring a range of vegetation; a media production centre; innovative classrooms and seminar rooms; picturesque central courtyard; a spacious graduate student lounge; a curated art collection; a wellness centre and rainwater recapture systems.

Racontez-nous un souvenir ou une anecdote au sujet de ce site

  • Stationnement
  • Accès complet en fauteuil roulant
  • Toilettes
  • Visites auto-guidées

Coordonnées

45 York Blvd., Schulich School of Business, York University
Toronto, Ontario
Téléphone : 416-650-8075
Email : sly@schulich.yorku.ca
http://schulich.yorku.ca

Architecture

Année de construction : 2018
Architect: Baird Sampson Neuert
Style architectural : Contemporain
Type de bâtiment : Établissement d'enseignement

Dates/hours open

samedi 25 mai – dimanche 26 mai 2019
Saturday and Sunday: 10 a.m. to 5 p.m.

Rob and Cheryl McEwen Graduate Study & Research Building 45 York Blvd., Schulich School of Business, York University